Contributors mailing list archives
contributors@odoo-community.org
Browse archives
Re: Alternative 8.0-9.0 migration procedure
byThanks for the feedback Pedro.By the way I have not tested it but I think it works also if the module being migrated does not yet exist on the 9.0 branch.-sbiOn Wed, Sep 14, 2016 at 10:23 AM Pedro M. Baeza (Tecnativa) <pedro.baeza@tecnativa.com> wrote:I have tried your procedure, Stephane, and it works very well, so for me we can switch the current procedure (I wrote it) with yours. I have only added one step to ensure 8.0 branch exists before making the rest of the steps.Regards.2016-09-12 16:53 GMT+02:00 Jairo Llopis <jairo.llopis@tecnativa.com>:2016-09-09 17:52 GMT+02:00 <Bidoul@pad.odoo-community.org> :I recently experienced difficulties with the usual migration procedure.I got a similar problem for updating the website_slides backport (so it's not exactly the "usual" procedure).Indeed the process needs some polishing. Filtering by date may work most times, but sometimes the merge takes place after that date, but the commit you are merging took place before, so it would get excluded.
--Jairo Llopis______________________________
_________________
Mailing-List: http://odoo-community.org/groups/contributors-15
Post to: mailto:contributors@odoo-community.org
Unsubscribe: http://odoo-community.org/groups?unsubscribe ______________________________
_________________
Mailing-List: http://odoo-community.org/groups/contributors-15
Post to: mailto:contributors@odoo-community.org
Unsubscribe: http://odoo-community.org/groups?unsubscribe ______________________________
_________________
Mailing-List: http://odoo-community.org/groups/contributors-15
Post to: mailto:contributors@odoo-community.org
Unsubscribe: http://odoo-community.org/groups?unsubscribe
Reference
-
Alternative 8.0-9.0 migration procedure
byAcsone SA/NV, Stéphane Bidoul-
Re: Alternative 8.0-9.0 migration procedure
byAcsone SA/NV, Stéphane Bidoul -
Re: Alternative 8.0-9.0 migration procedure
byTecnativa. S. L., Pedro M. Baeza -
Re: Alternative 8.0-9.0 migration procedure
byAcsone SA/NV, Stéphane Bidoul -
Re: Alternative 8.0-9.0 migration procedure
bySYLEAM SARL, Sylvain Garancher -
Re: Alternative 8.0-9.0 migration procedure
byTecnativa. S. L., Pedro M. Baeza -
Re: Alternative 8.0-9.0 migration procedure
bySYLEAM SARL, Sylvain Garancher -
Re: Alternative 8.0-9.0 migration procedure
byAcsone SA/NV, Stéphane Bidoul -
Re: Alternative 8.0-9.0 migration procedure
byTecnativa. S. L., Pedro M. Baeza -
Re: Alternative 8.0-9.0 migration procedure
byAcsone SA/NV, Stéphane Bidoul -
Re: Alternative 8.0-9.0 migration procedure
byTecnativa. S. L., Pedro M. Baeza
-